Exploration north of Stewart
Cat 307C hoe reassembly - first load
992 excavator about to be unloaded from lowbed
Grapple yarders parked outside maintenance yard in Scotia Creek
Wainwright Marine unloading a barge of equipment for BC Hydro job
Wainwright Marine barging Bear Creek machinery on the Skeena River
Robinson R22 parked on sandbar, Skeena River
Madill 144 being loaded onto lowbed
Loaded off-highway logging truck
Scotia Creek maintenance shop
Logging road construction
Helifor's Vertol performing water drop Surf Inlet
Offloading equipment barge @ Dam Creek
Working on Novagold Galore Creek project, summer 2007
Shutdown of Novagold project, winter 2007
Drilling and blasting project, summer 2007
Cat 307 transported by Bear Creek lowbed to the area is dismantled, flown by Lakelse Air to the remote work site and reassembled.
Lakelse Air slinging 307C to remote area. The hoe is disassembled at the base camp & flown to the mountainside in pieces.
On exploration job north of Stewart/Bobquinn
Logging truck being loaded
Fallers building heli pads out in Surf Inlet
Wainwright Marine hauling equipment to camps on the North Coast